Brownfield Redevelopment

Brownfield sites are typically inactive commercial and industrial properties with historic soil and ground water contamination.  These sites are often vacant and unproductive, but are located in areas where the site could be returned to beneficial use.  TRC Raviv specializes in the integration of site development plans and environmental remediation plans for the redevelopment of Brownfield sites.  These projects often involve redesigning the infrastructure for the site while simultaneously addressing environmental investigations and remediation.  TRC Raviv can provide investigation, remediation, design and construction management services and cost estimates.  We also work with developers and owners to obtain construction bids, and provide recommendations for contractor selection. During construction, TRC Raviv can manage all the technical, budgetary, and field supervision aspects of any Brownfields redevelopment project.

For more information, please contact Ken Siet at (973) 564-6006 ext. 217

Brownfield Redevelopment

Installation of Remediation System during Site Development and Construction Activities 

          Summary of Services

  • Site Development Plans 

  • Infrastructure Design

  • Site Remediation

  • Real Estate Transaction Guidance

  • Risk Assessment

  • Project Management

  • Construction Inspection Services